Quoting and Ordering - Scenario 1: Customer purchasing Success Track for multiple product architecture [Campus and Data Center Networking {DCN}] within the same quote/order
1. Line 1.0 Campus Product with Success Track of Level 1 Support on both Hardware and Subscription
2. Line 2.0 Campus Product with Solution Support on both Hardware and Subscription
3. Line 3.0 DNC Product with Success Track of Level 2 on both Hardware and Subscription
Success Track for Campus Network Product has the both HW and SW Support (L1NBD & L1SWT) Success Track of Level 2 is on DCN Product for which the Orderability rule is NOT enforced No impact on non-Success Track levels if there on the quote (Line 2.0 in the quote)
4. Once quote is Approved an Order can be placed
5. A Web Order ID is generated
6. Once an Order is completed successfully a Sales Order will be generated